“Look out!!! Look out!!” my uncle
sitting next to me in my car shouted as he saw a big pothole in the middle of a
road crowded with vehicles at my native. I was amazed. Not with the pothole but
at the intensity with which he shouted as he is used to very nice roads abroad.
I passed by that pothole carefully to see a sign “work in progress for
broadband cable” which was jamming all the traffic on that road with people
trying to avoid that. I wondered, why there was a work in progress now when the
road was constructed and was really nice for a 40-50 km|h speed just 2 months
back! After that my uncle shared the experience in the UK with me. There when
the road gets constructed, a big pipe is laid in the base having small
multicolored pipes inside it which has provision to insert cables later on if
there is a need without digging the well-constructed road. I was still thinking
on my WH question. Why this was happening?
Was this the lack of planning?
Had the engineers / contractors not considered this while constructing road
that there would be a big pothole coming up? Is it something which could have
been avoided easily? This and hundreds of questions blinked in my mind within a
fraction of second. And then it got linked to the software field as usual.
Let’s say that we build a really
nice software, almost bug free (exaggeration), catering complete set of
requirements by customers and stakeholders. Everything is hunky dory. Customer
is all set to start User Acceptance Testing. And suddenly after a release, customer says we want
change in the reporting format as it is not compatible with the third party
tool we are using. We’ve to fix this, we don’t have any choice. But it requires
breaking of a functionality currently built and tested thoroughly. Heavy risk of
breaking the existing code. But we pick it up and start working on it asking
customer to wait in commencing the User Acceptance Testing for the estimated time frame for this
change.
Same set of questions arise
there. What lacked? Planning, looking ahead, lack of vision? Forget about whose
fault it is as it will be person specific feedback. Blame it on the activity
instead and root cause. I’ll say it is the Vision and look ahead which lacked.
We all heard the story of a man
who sat on a branch and started cutting the same branch without being aware
that in some time branch and the culprit both will be on the ground. In his
case, lack of awareness of immediate future caused his current action.
In today’s software testing
world, we need more visionaries and the
people who work towards this study and make people in the organization aware
that see, this technology is coming our latest release should have a provision
for easy migration. Or see this is certain to happen, build it this way. This
will increase the value of our bid in challenging market conditions. Testers
can help this by asking right questions. In this case the domain knowledge
would become vital for testers. This way they can add value to the current
product / project they are working on.
As a result, whole organization
will agree that Product we build is of highest quality not only because we test
it well but our testers are visionary and predict the changes in advance.
2 comments: